Water Supply System Project
Post date:2007-7-30 Click times:3813
|
CEIEC signed the contract in 2005 to rebuild and enlarge the water supply system in three regions of an African country. The project was completed in 2007 and included the following:
• Designing
• Supplying and installing of equipment
• Constructing water treatment plant and cistern
• Laying municipal water distribution network and pipeline
• Adjusting and operating the system
• Post-project operation and maintenance work.

The big cistern with a capacity of 3000 m3.
|

President of the country and President of CEIEC attended the completion ceremony
|
|

Water came out of the pipes
|

Pipes across the woods
|
|
|